Note: While great efforts have been taken to provide accurate and complete information on the pages of CPEP, please be aware that the information contained herewith is considered a work-in-progress for this thesis project. Modifications and changes related to the original building designs and construction methodologies for this senior thesis project are solely the interpretation of Katie Sennett. Changes and discrepancies in no way imply that the original design contained errors or was flawed. Differing assumptions, code references, requirements, and methodologies have been incorporated into this thesis project; therefore, investigation results may vary from the original design.

 

 

 Thesis Abstract

 

Executive Summary
The Kennedy Krieger Institute Outpatient Medical Center is a 6 story cast in place structure.  It is located in downtown Baltimore on the corner of East Madison Avenue and North Broadway and is next to the Existing Kennedy Krieger Institute and the John Hopkins Medical University.  This building includes 30 exam rooms, 15 treatment rooms, several conference rooms, 54 offices and a physical therapy/occupational therapy gym, a spinal cord gym, and a physical therapy Natatorium, which includes two pools varying in size.  In order to start excavation and construction, an existing parking lot will need to be first removed.  Once the parking lot is removed, construction on site will begin.   The Outpatient Medical Center is being constructed beside the Kennedy Krieger Institute Parking Garage which was recently built and it will utilize parking for the two Kennedy Krieger buildings in that location.
Once the project is completed it will be The Kennedy Krieger Institute Outpatient Medical Center and The Harry and Jeanette Weinberg Developmental Disabilities Center.  The primary project team members are as follow:



    Click here to view My Thesis Abstract

 

 

 

 

 

 

Special Thanks to: Whiting-Turner Contracting Company, Stanley, Beaman, & Sears Architect, Kennedy Krieger Institute
SENIOR THESIS | THE PENNSYLVANIA STATE UNIVERSITY | ARCHITECTURAL ENGINEERING | AE LAB | CONTACT KATIE SENNETT: kas568@psu.edu
This Page was last updated on Apr. 22, 2008 , By Katie Sennett and is hosted by the AE Department ©2007